Skip to content

Liang/rebuild/b rebuild down2up 2#17726

Draft
gnailzenh wants to merge 5 commits intomasterfrom
liang/rebuild/b_rebuild_down2up_2
Draft

Liang/rebuild/b rebuild down2up 2#17726
gnailzenh wants to merge 5 commits intomasterfrom
liang/rebuild/b_rebuild_down2up_2

Conversation

@gnailzenh
Copy link
Contributor

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

Properly set shard status based on down2up flag, avoid unnecessary
layout change, which may cause data integrity issue, when rebuild
is interrupted by reintegration.

Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
@github-actions
Copy link

Errors are component not formatted correctly,Ticket number prefix incorrect,PR title is malformatted. See https://daosio.atlassian.net/wiki/spaces/DC/pages/11133911069/Commit+Comments,Unable to load ticket data
https://daosio.atlassian.net/browse/Liang/rebuild/b

@daosbuild3
Copy link
Collaborator

@daosbuild3
Copy link
Collaborator

Test stage Unit Test with memcheck on EL 8.8 completed with status UNSTABLE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos//view/change-requests/job/PR-17726/1/testReport/

Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
@daosbuild3
Copy link
Collaborator

@daosbuild3
Copy link
Collaborator

Test stage Unit Test with memcheck on EL 8.8 completed with status UNSTABLE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos//view/change-requests/job/PR-17726/2/testReport/

Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
@daosbuild3
Copy link
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos/job/PR-17726/3/display/redirect

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Development

Successfully merging this pull request may close these issues.

2 participants