-
Notifications
You must be signed in to change notification settings - Fork 108
Pull requests: openshift/sippy
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Add two-node-fencing to the 4.22 main CR view and a 4.22-ha-vs-two-no…
#3381
opened Mar 27, 2026 by
jogeo
Loading…
Automated - Update config ./config/openshift.yaml
#3380
opened Mar 27, 2026 by
openshift-bot
Loading…
NO-JIRA: feat: add two node arbiter to component readiness
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3379
opened Mar 27, 2026 by
eggfoobar
Loading…
config: add stolostron/capi-tests CAPZ e2e jobs
lgtm
Indicates that a PR is ready to be merged.
#3377
opened Mar 27, 2026 by
RadekCap
Loading…
2 tasks
TRT-2592: make view and other parameters coexist in test details url
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3375
opened Mar 26, 2026 by
xueqzhan
Loading…
WIP: Add CodeRabbit path_instructions from PR review analysis
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lgtm
Indicates that a PR is ready to be merged.
#3374
opened Mar 26, 2026 by
dgoodwin
Loading…
3 tasks
Expose filter toolbar on build cluster detail page
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#3373
opened Mar 26, 2026 by
stbenjam
Loading…
3 tasks done
TRT-2548: CR caching: extend cache time for stable data
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3366
opened Mar 25, 2026 by
sosiouxme
Loading…
Update Sippy Chat to support Atlassian Cloud configuration
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#3354
opened Mar 20, 2026 by
stbenjam
Loading…
[wip] Add script to re-evaluate job run classifications from DB
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#3345
opened Mar 18, 2026 by
stbenjam
Loading…
Trt-1989: partition management
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3334
opened Mar 17, 2026 by
neisw
Loading…
TRT-1989: remove ProwJobRunTest during partition migration
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3333
opened Mar 17, 2026 by
neisw
Loading…
perf: push filters into test report subqueries (~830x improvement)
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#3290
opened Feb 23, 2026 by
stbenjam
Loading…
Partitions
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
WIP: add diagram that details the dataflow in component-readiness
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
Drop rhcos10 from 4.22 main, covered by aux view
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
#3217
opened Jan 28, 2026 by
dgoodwin
Loading…
Stop updating triaged Jiras when all regressions resolve
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
#3139
opened Dec 3, 2025 by
dgoodwin
Loading…
CMP-3987: Add Component Readiness dashboard for Compliance Operator
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#3137
opened Dec 2, 2025 by
xiaojiey
Loading…
[wip] Add custom prompt management feature
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#3088
opened Nov 5, 2025 by
stbenjam
Loading…
ProTip!
Mix and match filters to narrow down what you’re looking for.